Factory Re-Lighting with Tamlite Lighting

Partnering with Tamlite Lighting to deliver a full lighting upgrade at a plastic manufacturing facility

Factory Re-Lighting with Tamlite Lighting

Project gallery…
Factory Re-Lighting with Tamlite Lighting

Project Overview

Glasby Electrical partnered with Tamlite Lighting to deliver a full lighting upgrade at a plastic manufacturing facility. The aim was to improve visibility, enhance workplace safety, and reduce energy consumption—ultimately lowering ongoing operational costs.

Scope of Works

Lighting Design & Planning: Collaborated with Tamlite to create a bespoke lighting scheme using industrial-grade, energy-efficient LED luminaires tailored to the factory’s layout and specific operational needs.

Installation: Carried out the complete electrical installation, including the safe removal of outdated lighting, circuit modifications, and the installation of new LED units across all key areas—production, storage, and administration.

Compliance & Safety: Delivered a fully compliant system with integrated emergency lighting, designed to meet current lux level requirements and energy efficiency standards.

Outcome

The project delivered a 40% reduction in energy use and significantly enhanced overall lighting quality throughout the facility. The investment paid for itself within just 1.3 years through energy savings and lower maintenance costs.

The client now benefits from a modern, reliable lighting system that improves both safety and productivity.

For general enquiries, or information regarding this project please contact Glasby Electrical
Telephone: 01909 486702